taurine side effects


Handri nadhi

Tanguturi Prakasam
Today’s Our Kurnool

The lift canal with a length of nearly 550 km, takes off from the back waters of Srisailam reservoir and routed along the hill ridges up to handri-nadihigh lands in Chittoor district via Kurnool and Ananthapur districts with many lifts / pumping stations. The canal feeds many existing tanks which are used for drinking water and irrigation needs. It is planned to use nearly 30 Tmcft water from the Krishna River under this project.
The project operational requirement is 653 MW power and 1.9 billion KWh of electrical energy annually for pumping 30 Tmcft water

Tanguturi Prakasam
Today’s Our Kurnool

Related Topics

    Leave a Reply

    Your email address will not be published. Required fields are marked *